Skip to content

Projects

Work that kept buildings running

Refurbishments, fit-outs and waterproofing in hospitals, schools and offices, each planned around the people who used the building while we worked.

Showing 6 projects.

Bright hospital waiting corridor with coral walls and white chairsHospitals and healthcare

Outpatient wing refurbishment

Private multi-specialty hospital

Waiting areas, consultation rooms and corridors refitted zone by zone while every clinic stayed open, with dust screens, after-hours noisy work and a clean handover of each finished zone.

14 weeks, phasedView project
Clean white consultation room with a desk, stethoscope and storage unitsHospitals and healthcare

Consultation suite fit-out

Specialist clinic in a general hospital

An empty floor turned into twelve consultation rooms, a minor procedures room and a staff base, with sealed ceilings, coved flooring and a hand-wash point in every room.

9 weeksView project
Students reading papers at their desks in a bright classroomSchools and colleges

Classroom block renovation

Day school, primary and secondary

Fourteen classrooms, two corridors and the staff room renovated over the summer break and handed back clean, safe and inspected a week before the new term.

7 weeks, summer holidaysView project
Weathered, damp-stained concrete surface before waterproofingSchools and colleges

Roof and facade waterproofing

Primary school campus

A leaking flat roof and damp, cracked external walls repaired and protected, with all noisy and high-level work scheduled around the school day.

4 weeksView project
Meeting room behind fluted glass partitions with a high table and stoolsOffices and workplaces

Head office fit-out

Technology company, three floors

Three bare floors turned into a working head office with meeting rooms, focus booths, a cafe and a reception, handed over with the furniture in place.

12 weeksView project
Site engineer in a hard hat holding a tablet outside a building under constructionOffices and workplaces

Terrace and basement waterproofing

Six-storey commercial building

A leaking roof terrace and a damp basement car park fixed for good: failed layers removed, cracks injected, new membranes laid and every area tested before handover.

3 weeksView project

Next step

Have a building like these?

Tell us what needs doing. We will visit, take a proper look and come back with a written quote and programme.