Skip to content

Interiors, exteriors and waterproofing

We build and protect the spaces where people heal, learn and work.

Archwell Interiors is an interior and exterior contractor for hospitals, schools and offices. We plan every job around the people using the building, keep sites clean and safe, and seal roofs, walls and wet areas so the water stays out.

  • Phased work in occupied buildings
  • One team from survey to handover
  • Waterproofing tested before handover

Projects

Recent work

The kind of jobs we take on, from wards that stayed open to terraces that finally stopped leaking.

All projects
Bright hospital waiting corridor with coral walls and white chairsHospitals and healthcare

Outpatient wing refurbishment

Private multi-specialty hospital

Waiting areas, consultation rooms and corridors refitted zone by zone while every clinic stayed open, with dust screens, after-hours noisy work and a clean handover of each finished zone.

14 weeks, phasedView project
Students reading papers at their desks in a bright classroomSchools and colleges

Classroom block renovation

Day school, primary and secondary

Fourteen classrooms, two corridors and the staff room renovated over the summer break and handed back clean, safe and inspected a week before the new term.

7 weeks, summer holidaysView project
Meeting room behind fluted glass partitions with a high table and stoolsOffices and workplaces

Head office fit-out

Technology company, three floors

Three bare floors turned into a working head office with meeting rooms, focus booths, a cafe and a reception, handed over with the furniture in place.

12 weeksView project

Waterproofing

Leaks fixed at the source, then tested

Water usually shows up far from where it gets in. We trace it, fix the cause and install a complete system, so the repair you pay for is not the first of many.

  • Roofs and terraces
  • Basements and car parks
  • Toilets and wet areas
  • Water tanks and sumps
  • External walls
  • Expansion joints

Typical flat roof build-up

Flood tested
  1. 05FinishTiles, screed or a walkable top coat
  2. 04Protection layerShields the membrane from traffic and sun
  3. 03Waterproof membraneContinuous, lapped and turned up at every edge
  4. 02PrimerBonds the system to the prepared surface
  5. 01Repaired substrateCracks filled, slopes corrected, surface sound
Every layer has a job. Skip one and the system fails early, usually at an edge, a joint or a drain outlet.

How we work

Built around the people inside

Patients, pupils and staff keep using the building while we work. Everything about how we run a site starts from that.

  • Safe, contained sites

    Dust screens, signage and separate routes keep the work away from patients, pupils and staff.

  • Programmes that hold

    A week-by-week plan with every quote and weekly updates, so handover dates do not drift.

  • One accountable team

    A single project lead coordinates every trade, from the first survey to the final clean.

  • Tested and documented

    Waterproofing is flood-tested, and every job ends with a handover pack of photos and products used.

Process

From first visit to handover

Five clear stages, agreed in writing before we start, so you always know what happens next and when.

  1. 01

    Site survey

    We visit, measure, check the existing condition and talk to the people who use the building.

  2. 02

    Quote and programme

    A written quote broken down by area and trade, with a programme showing each phase and any out-of-hours work.

  3. 03

    Planning

    Work zones, access routes and safety measures agreed with your facilities team before anyone starts.

  4. 04

    Delivery

    A site supervisor on every job, daily clean-downs and weekly progress updates with photos.

  5. 05

    Testing and handover

    Flood tests for waterproofing, a joint snag walk and a handover pack with everything we used.

FAQ

Questions we hear often

Anything else on your mind? Ask us when you request a survey and we will answer it on the call.

Next step

Tell us about your building

Share what needs doing and when the building is quietest. We will arrange a site survey and come back with a written quote and programme.