Skip to content

Services

Waterproofing

We find where the water is really getting in, fix the cause and install the right system for the surface, then prove it with a flood test before we hand the area back.

Weathered concrete surface with damp stains and fine cracks
  • Leak traced to its source before we quote
  • System chosen for the surface and its use
  • Flood-tested and documented at handover

What we do

Waterproofing, from start to finish

Roofs, terraces, basements and wet areas sealed properly, then tested.

01

Roofs and terraces

  • Liquid-applied membranes
  • Torch-on and sheet membranes
  • Polyurethane and acrylic coatings
  • Insulated roof systems
02

Basements and below ground

  • Crack and joint injection
  • Crystalline waterproofing
  • Treatments from the inside face
  • Sump and drainage detailing
03

Wet areas

  • Toilets and bathrooms
  • Kitchens and pantries
  • Shower and wash areas
  • Membranes under tiles
04

Tanks, walls and joints

  • Water tanks and sumps
  • External wall treatments
  • Expansion joint sealing
  • Planters and podium decks

The system

A membrane is only as good as the layers around it

We build waterproofing as a complete system: a sound, sloped surface, a primer that bonds, a continuous membrane turned up at every edge, and protection on top so it lasts.

Typical flat roof build-up

Flood tested
  1. 05FinishTiles, screed or a walkable top coat
  2. 04Protection layerShields the membrane from traffic and sun
  3. 03Waterproof membraneContinuous, lapped and turned up at every edge
  4. 02PrimerBonds the system to the prepared surface
  5. 01Repaired substrateCracks filled, slopes corrected, surface sound
Every layer has a job. Skip one and the system fails early, usually at an edge, a joint or a drain outlet.

How we do it

Four steps, every time

The same disciplined method on every job, whatever its size.

  1. 01

    Find the source

    Water travels before it shows. We inspect above and around the damp, check drains, joints and upstands, and confirm where it is getting in.

  2. 02

    Prepare the surface

    Failed layers come off, cracks are opened and repaired, and the surface is cleaned and primed so the new system bonds.

  3. 03

    Install the right system

    A membrane, coating or crystalline treatment, chosen for the surface, the exposure and the way the area is used.

  4. 04

    Test and document

    Flat areas are flood-tested before they are covered, and you get a handover record with photos and the products used.

FAQ

Waterproofing questions

Anything else on your mind? Ask us when you request a survey and we will answer it on the call.

Next step

Talk to us about waterproofing

Tell us about the building, the problem and your timing. We will visit, take a proper look and send a written quote with a programme.