Skip to content

About us

A contractor that works around you

Archwell Interiors brings interior fit-out, exterior works and waterproofing together under one team, for buildings where people cannot simply be moved out of the way.

Painter in paint-flecked overalls standing in front of an orange stepladder

Why we work this way

One team, from the first survey to the final clean

Refurbishing a ward, a classroom block or an office floor usually means juggling separate contractors for partitions, finishes, painting and waterproofing, each with their own programme and their own reasons why someone else is holding them up.

We set Archwell Interiors up to take that problem off your desk. Our crews cover the inside, the outside and the waterproofing, coordinated by one project lead who answers for the whole job.

Because most of our clients cannot close their buildings, we plan around them: phased zones, out-of-hours work for anything noisy, protected routes and sites that are cleaned down every day.

What we stand for

Four things we will not compromise on

  • 01

    The people inside come first

    Patients, pupils and staff keep using the building. We plan noise, dust and access around them, not the other way round.

  • 02

    Straight answers

    Clear quotes, honest programmes and an early warning when something on site is not what anyone expected.

  • 03

    Work that lasts

    Repairs before finishes, proper surface preparation, and waterproofing that is tested rather than hoped for.

  • 04

    Tidy, safe sites

    Method statements, permits, protective equipment and a daily clean-down on every job, however small.

On every site

Safety, cleanliness and quality

The standards we hold ourselves to on every job, from a single toilet block to a whole hospital wing.

Two site workers in hi-vis vests on a scaffold inside a glazed building
  • Safety

    • Risk assessment and method statement for every job
    • Permits for work at height and hot work
    • Inducted, supervised crews in the right protective equipment
  • Cleanliness

    • Sealed dust screens and filtered extraction
    • Protected floors, lifts and walkways
    • A full clean-down at the end of every shift
  • Quality

    • Inspections at each stage, before work is covered up
    • Flood tests on waterproofed floors and roofs
    • Joint snag walk and a handover pack at the end

Process

From first visit to handover

Five clear stages, agreed in writing before we start, so you always know what happens next and when.

  1. 01

    Site survey

    We visit, measure, check the existing condition and talk to the people who use the building.

  2. 02

    Quote and programme

    A written quote broken down by area and trade, with a programme showing each phase and any out-of-hours work.

  3. 03

    Planning

    Work zones, access routes and safety measures agreed with your facilities team before anyone starts.

  4. 04

    Delivery

    A site supervisor on every job, daily clean-downs and weekly progress updates with photos.

  5. 05

    Testing and handover

    Flood tests for waterproofing, a joint snag walk and a handover pack with everything we used.

Next step

Tell us about your building

Share what needs doing and when the building is quietest. We will arrange a site survey and come back with a written quote and programme.