A leaking roof terrace and a damp basement car park fixed for good: failed layers removed, cracks injected, new membranes laid and every area tested before handover.

Client
Six-storey commercial building
Duration
3 weeks
Site engineer in a hard hat holding a tablet outside a building under construction

The brief

Water came through the top-floor ceilings every time it rained, and the basement car park walls were wet and staining. Tenants were complaining, and earlier patch repairs had not lasted.

How we worked

We inspected the building in dry and wet conditions to find where the water was really getting in. On the terrace we removed the failed screed, repaired the slab and laid a new seamless membrane up to the parapets. In the basement we injected the active cracks and applied a crystalline coating that seals the concrete from within.

  • Work sequenced so tenants kept their parking
  • Terrace flood-tested before the new screed and tiles
  • Written handover report with photos and product details

The result

No more leaks into the top floor and dry basement walls, with a clear record of the work for the building manager's files.